
Civil.
18 active projects · $1.2B portfolio
Bulk earthworks, roads, rail, bridges, ports, power stations and industrial subdivisions — delivered in challenging urban, regional and remote conditions.
See projects
Civil, mining and urban development at scale — from the Curragh coal mine to Sanctuary Cove. Over $5 billion delivered in the last decade alone.
Golding operates inside NRW Holdings (ASX:NWH) — a national, multidisciplinary contractor with$3B+ revenue and a workforce of over 8,000. Group scale meets local delivery: the equipment fleet, balance sheet and engineering depth of a tier-one contractor, with the responsiveness Golding has built its reputation on for 75 years.
Built on the same management systems, plant fleet and engineering capability — sharpened with sector-specific expertise.

18 active projects · $1.2B portfolio
Bulk earthworks, roads, rail, bridges, ports, power stations and industrial subdivisions — delivered in challenging urban, regional and remote conditions.
See projects
24/7 operations · 4 active mine sites
Full open-cut services for coal and metalliferous operations, supported by proprietary planning systems that optimise circuit performance shift-by-shift.
See projects
12 master-planned communities
Earthworks, drainage, roads and large-scale water and energy infrastructure for residential, industrial and commercial developers across the east coast.
See projectsISO management systems and industry-body membership across quality, safety and environment.
ISO 9001
Quality Management
ISO 14001
Environmental Management
ISO 45001
Health & Safety Management
AS/NZS 4801
OHS Management Systems
CCF
Civil Contractors Federation
MBA
Master Builders Australia
A snapshot of work that shows our range — from public infrastructure to long-running mining programmes.

Signature red-deck overpass connecting Caloundra South to the Bruce Highway corridor. Delivered through complex traffic, environmental and marine conditions.

Long-term open-cut services including overburden removal, mine-site infrastructure and rehabilitation — backed by Golding's proprietary fleet-optimisation platform.

Premium residential infrastructure — earthworks, drainage, roads and environmental works for one of Australia's most established master-planned communities.
Project metrics shown are illustrative for this redesign concept.
A deserved reputation for reliably launching, delivering and closing projects — within the required timeframe, for the agreed price.
Talk to our teamISO-aligned management systems. A considered, disciplined approach that eliminates rework — and ensures projects close as cleanly as they launched.
Safety culture led from the shovel up. Zero-harm targets backed by sector-leading reporting, training and visible field leadership across every site.
Rehabilitation, environmental dam construction and reclamation earthworks are core capabilities — not retro-fits. Community-positive outcomes by design.
Mining houses, energy companies, government infrastructure bodies and master-planned-community developers — across the east coast and beyond.
“Golding ran a complex bridge programme through live traffic, environmental constraints and tight community oversight. Came in on time and on budget with zero rework — exactly what their reputation suggested.”
Senior Project Director
Infrastructure Owner · QLD
On-time delivery · $148M scope
“On long-term mining contracts you find out very quickly whether a contractor can sustain performance. Golding's fleet optimisation and shift-discipline are the most consistent we've seen in the basin.”
Operations Manager
Coal Resources · Bowen Basin
10-year programme · 24/7 operations
“We've worked with Golding across multiple staged releases for over three decades. Same approach every time — engineering depth, problem-solving on site, and a delivery culture that doesn't blink at scale.”
Development Director
Master-Planned Communities · QLD
32-year partnership · $200M+ infrastructure
A snapshot of clients we've delivered for
Testimonials and client list are illustrative for this redesign concept.
Crews on the ground from Whyalla to Mackay — project leadership close to your site, wherever it is. Hover any pin to see office details.
Head office
Level 2, 40 McDougall St, Milton
+61 7 3510 3400
1 Zupp Drive, Ormeau
+61 7 5557 6100
Level 3, 100 Goondoon St
+61 7 4976 0400
128 Victoria Parade
+61 7 4976 0400
216 Harbour Road, Nth Mackay
+61 7 4968 5510
44 Patterson Street
+61 8 8647 8411
Merit-based progression. Practical training. Genuinely safe sites. We grow operators, supervisors and engineers from the field up — across mining, civil and urban development.
View current vacanciesTell us about your site, your timeline, and the outcome you need. We'll come back within one business day.